Galactic Line · A Series

Nine Capsules.
One Galactic Standard.

The A Series is our flagship line of space capsule homes — three footprints (A30 / A50 / A70), each in Standard, Pro and Ultra trim. From a 12.5 m² micro-retreat to a 50 m² double-deck residence, every unit ships factory-direct in one 40HQ container.

CE / ISO9001 / TUV certified 50-year structural warranty 10–60 working days delivery OEM / ODM available
Showing 9 of 9 models
Haishu A30 compact space capsule home in a birch forestStandard

A30 Single Level

5.8×2.15×2.5 m 12.5 m² Sleeps 2–4

Space-engineered compact luxury — voice automation, spa-inspired bathroom and a panoramic balcony in just 12.5 m².

$19,800EXW · China
Request Quote
Haishu A30 Pro widened capsule home with wide glass facadePro

A30 Pro Wide Body

5.8×4.3×2.5 m 25 m² Sleeps 2–4

Craftsmanship meets modular design — a widened 25 m² layout with fresh-air purification and artisanal finishes.

$38,800EXW · China
Request Quote
Haishu A30 Ultra double-deck vertical capsule home at duskUltra

A30 Ultra Double Deck

5.8×2.15×5.0 m 12.5 m² footprint Sleeps 2–4

Vertical luxury living — a 5-meter multi-level architecture with patented vertical circulation and SkySpa bathroom pod.

$41,800EXW · China
Request Quote
Haishu A50 space capsule home on a seaside hillsideStandard

A50 Single Level

8.5×2.15×2.5 m 18.2 m² Sleeps 2–4

Horizontally optimized living — 45% lower energy use, 90% recyclable materials and optional solar integration.

$25,800EXW · China
Request Quote
Haishu A50 Pro expandable capsule house at sunsetPro

A50 Pro Expandable

8.5×4.3×2.5 m 35.6 m² Sleeps 2–6

An expandable design that doubles usable space — multi-zone climate control and spatial audio for the whole family.

$51,800EXW · China
Request Quote
Haishu A50 Ultra vertical double-level capsule homeUltra

A50 Ultra Double Deck

8.5×2.15×5.0 m 18.2 m² footprint Sleeps 2–4

The vertical space revolution — mezzanine platforms, spiral staircase and level-based voice settings within 18.2 m².

$53,800EXW · China
Request Quote
Haishu A70 long linear space capsule home at a snowy mountain resortStandard

A70 Single Level

11.5×2.15×2.5 m 25 m² Sleeps 2–4

An 11.5-meter linear masterpiece — independent zones for living, bathing and sleeping with a full glass ribbon.

$34,800EXW · China
Request Quote
Haishu A70 Pro wide expandable flagship capsule residencePro · Flagship

A70 Pro Expandable

11.5×4.3×2.5 m 50 m² Sleeps 2–8

Redefining expandable luxury — 50 m² on a 14-ton platform with panoramic LED balcony and starry-sky projection option.

$68,800EXW · China
Request Quote
Haishu A70 Ultra double-deck vertical capsule residenceUltra · Flagship

A70 Ultra Double Deck

11.5×2.15×5.0 m 50 m² · 2 levels Sleeps 2–8

The vertical flagship — 50 m² across two levels with elevated bedroom, optional rooftop terrace and skylight system.

$71,800EXW · China
Request Quote

At a Glance

Compare the Full Lineup

Model Size (L×W×H) Area Layout Occupants Structure EXW Price
A305.8 × 2.15 × 2.5 m12.5 m²Single level2–4Seismic steel$19,800
A30 Pro5.8 × 4.3 × 2.5 m25 m²Wide body2–47-ton steel$38,800
A30 Ultra5.8 × 2.15 × 5.0 m12.5 m² · 2 levelsVertical double deck2–4Seismic steel$41,800
A508.5 × 2.15 × 2.5 m18.2 m²Single level2–4Seismic steel$25,800
A50 Pro8.5 × 4.3 × 2.5 m35.6 m²Expandable wide2–610-ton steel$51,800
A50 Ultra8.5 × 2.15 × 5.0 m18.2 m² · 2 levelsVertical mezzanine2–4Seismic steel$53,800
A7011.5 × 2.15 × 2.5 m25 m²Linear single level2–4Seismic steel$34,800
A70 Pro11.5 × 4.3 × 2.5 m50 m²Expandable wide2–814-ton steel$68,800
A70 Ultra11.5 × 2.15 × 5.0 m50 m² · 2 levelsVertical double deck2–8Reinforced steel$71,800

All prices are EXW (ex-works) reference prices in USD, excluding shipping and installation. Shipped in one 40HQ container. OEM/ODM and bespoke layouts available.

One Series, One Standard

Every A Series Ship Shares the Same DNA

Regardless of trim, every Galactic A Series capsule is built on the same certified platform — then personalized to your mission.

01 Structure & Envelope

  • Thickened seismic steel frame, hot-dip galvanized
  • Aviation-grade aluminum panels, fluorocarbon baked finish
  • Triple-layer insulation — 50 mm high-density PU + foam
  • Double tempered Low-E insulating glass (6+12A+6)
  • Bamboo-charcoal fiberboard interior walls
  • SPC indoor flooring / WPC balcony decking

02 Smart Living

  • Whole-house AI voice control — lights, climate, curtains
  • Gree inverter air conditioning + fresh-air system
  • Electric curtains with metal track & nylon pulleys
  • Intelligent door lock — waterproof smart access
  • Opple three-color LED lighting + ambient light strips
  • Exterior multicolor LED outline lighting

03 Bathroom & Safety

  • Jomoo intelligent toilet, basin, faucet & shower
  • Air-heated all-in-one bath heater
  • Haier smart storage water heater
  • Frosted tempered glass privacy door
  • Smoke alarm fire monitoring system
  • Wrap-around electric anti-freeze heat tracing

04 Certifications

  • CE certified for European market
  • ISO9001 quality management system
  • TUV component-level certification
  • 50-year warranty on panels & frame

05 Delivery & Shipping

  • 10–60 working days production lead time
  • One 40HQ container per unit
  • Factory-direct EXW pricing
  • OEM & ODM service available

06 Optional Upgrades

  • Electric floor heating system
  • Projector immersive entertainment
  • Kitchenette module
  • Solar integration & energy management

Ready for Launch?

Configure Your A Series Capsule

Tell us the model, destination and quantity — we'll reply within 24 hours with layout drawings, EXW/FOB pricing and shipping options.