Modular Homes for Sale: Resort Buyer Checklist

Modular homes for sale: unit price versus delivered and commissioned price, reading a scope list, size and cranage effects, and the document package.

Crane lifting a modular unit onto prepared concrete piers with a crew guiding the load

Two modular home offers can differ by a wide margin while looking identical, because the number at the bottom of each quote covers a different set of things. One includes delivery and cranage, the other stops at the factory gate; one includes commissioning, the other stops at the last bolt. This page is for a hospitality buyer comparing offers: how to separate the unit price from the delivered and commissioned price, how to read a scope list line by line, what size and module count do to transport and cranage, what the supplier needs from you before production starts, what the documents package should contain, and the five questions that most often separate two similar-looking offers. Design guidance stays in the modular homes guide, the cost structure stays in modular homes cost, size and configuration ranges stay in modular home sizes, and the general commercial reference is capsule house price.

Three prices, not one

Every offer can be read as three numbers, and the discipline of separating them removes most of the confusion:

  • Unit price. What the module costs to build. Comparable between suppliers only if the specification is genuinely the same.
  • Delivered price. Unit price plus packing, inland transport to port, freight, insurance and port handling. Which of these are included is a commercial term, not a technical one.
  • Commissioned price. Delivered price plus cranage, placement, connection to services, commissioning and snagging. This is the number that corresponds to a room you can let.

Ask each supplier to state which of the three they are quoting. A quote that omits the answer is not necessarily worse; it is simply not comparable yet, and it is reasonable to ask for the same three lines from everyone.

Reading the scope list

The scope list is where an offer is actually defined. Work down it and mark each line as included, excluded or silent, because silence is the expensive category:

  • Interior finishes and fitments. Floor, wall and ceiling finishes, joinery, bathroom fittings, appliances, window coverings, lighting.
  • Services inside the unit. Wiring, protection devices, plumbing, hot water, heating and cooling, ventilation, and whether controls are included.
  • External items. Steps, terrace or deck, handrails, shading, canopy, external lighting, skirt or closure panel.
  • Transport. Packing, inland haulage, freight, insurance, port handling, and any permit or escort for an oversize load.
  • Site work. Crane and operator, placement crew, fixing down, connection to services, commissioning attendance.
  • Documents. Drawings, load and anchor data, operation and maintenance manuals, inspection and test records.
  • Aftercare. Warranty scope and term, spare parts, response arrangements, and what voids the warranty.

Two offers that differ by a visible margin often differ precisely because one of them has included the second and fourth groups and the other has not. Mark the silences before comparing totals.

Two people reviewing rolled drawings on a table beside sample finish boards and a laptop
Finish boards and a drawing set are how scope stops being a description and becomes a schedule.

What size and module count do to transport

Dimensions are not only about how the room feels. They determine how the unit travels:

  • Width and height set the transport class. A module that exceeds the limits for a standard container or a standard road load becomes an exceptional load, with escort and permit requirements and a different cost structure.
  • Length and weight set the crane. A heavier or longer module needs a larger machine and a bigger working area, which on a tight or soft site can mean ground preparation.
  • Module count sets the number of lifts and joints. More modules means more lifts, more connections to make and test on site, and more sites where a joint can leak.
  • Access sets what is possible at all. A narrow lane, a low bridge or a soft verge can rule out a configuration that looks fine on paper.

Check the route before committing to a size. A configuration that requires a road survey, a permit and a police escort changes both the cost and the programme, and that belongs in the comparison rather than in a later variation.

What the supplier needs from you before production starts

Production cannot begin on a specification alone. The following are typically required, and late answers delay the slot:

  • Final configuration and finish schedule. Named, not described.
  • Site conditions. Foundation type and levels, service connection points, access dimensions and ground bearing.
  • Design basis for the site. Wind, seismic and thermal assumptions appropriate to the location, confirmed by the designer and the authority having jurisdiction.
  • Electrical characteristics at the point of connection, confirmed locally.
  • Delivery address and receiving arrangements, including who unloads and where.

Ask which of these are hard gates on the production slot. The one that most often delays an order is not payment; it is a foundation or service detail that nobody had authority to confirm.

Interior of an unfinished modular unit showing insulation batts and cabling before wall lining is fitted
The stage worth visiting is the one before the lining goes on, when the services are still visible.

The five questions that separate two offers

When two quotes are close, these five usually decide it:

  1. What is the warranty, in writing? Scope, term, what is excluded, whether it covers parts only or parts and labour, and where the remedy happens.
  2. What does the installation scope include and what does the site have to provide — named on both sides.
  3. What are the documents, at which revision, and when are the foundation-relevant ones released?
  4. What is the lead time measured from — from order, from drawing approval, or from deposit clearance?
  5. What happens if the site is not ready on the delivery date: storage, re-delivery, and who pays.

Answers given vaguely to these five are themselves information. Ask for them in writing and compare the answers rather than the tone.

Documents worth insisting on

Ask for the drawings at a revision you can build foundations from, the load and anchor data, the services schematic with ratings, the operation and maintenance set, and the inspection and test records for the specific units shipped. Where any document cites a standard or a test result, ask for the underlying report and verify it against the applicable standard. Do not treat a stated certification as held; request the paperwork and check its scope and validity. Requirements may vary by application, market and applicable standard.

A short buyer's sequence

The order that works in practice: fix the site conditions first, then the configuration, then the scope list, then ask three suppliers to quote the same three prices against the same list, then compare the answers to the five questions. Comparing headline numbers before the scope is fixed produces a decision that has to be revisited, and revisiting it after production has started is the most expensive version of the same exercise.

A note on visiting before you order

A factory visit answers questions that no document answers properly: how the line is organised, how work in progress is identified, how defects are recorded, and whether the unit you saw at a showroom is the unit that gets built. Ask to see a unit at the stage before internal linings are fitted, because that is the only moment when the services and the structure are visible together. Ask what happens to a unit that fails inspection at that stage, and where it goes.

Talk to the Factory